TECL BACKGROUND FOR IRAQ REFURBISHMENT SERVICES

TECL BACKGROUND FOR IRAQ GENERATOR SERVICES

GAZ TURBINE MAJOR REHABILITATION

OIL & GAS

GAS INJECTION PROJECT MANAGER

PROJECT TYРE:   Lump Sum Turn Key (LSTK)

PROJECT PERIOD:   32 Months

RESPONSIBILITY:   Project Manager

SCOPE OF WORK:

  • Basic Desig
  • Detail Engineering
  • Construction
  • Commissioning
  • Local and Foreign Procurement

BRIEF DESCRIPTION:

  • Largest gas injection project in the Middle East to increase oil production from 172,000 up to 300,000 barrel/day.
  • 7 turbo compressor (300 MMSCF/D each).
  • 50 Km 24 injection pipe lines.
  • Injection of 2000 MMSCF/D gas into 24 wells during 20 years.

OIL & GAS

GAS TREATMENT PLANT

PROJECT TYPE:   Project Management Contractor (PMC)

RESPONSIBILITY:   Project Manager


SCOPE OF WORK:

  • Engineering View and Coordination
  • Project Planning and Control
  • Procurement Services
  • Local Fabrication Management
  • Construction Management
  • Commissioning Management
  • QA/QC Management


BRIEF DESCRIPTION:

gas treatment plant has two phases that is established to refinery gas field and gas transmission with receiving ethane and other heavier hydrocarbons and also feeding petrochemical complex.

OIL & GAS

Winning a key role in some projects, especially in oil, gas and power sector is the result of our long-term expertise and E.P.C. projects.

  • 168 MW SIMPLE CYCLE GAS TURBINE POWER PLANT
  • 132 MW POWER TRANSMISSION LINES.


168 MW SIMPLE CYCLE GAS TURBINE POWER PLANT

  • Execution of gas field development in order to acquire a daily amount of 80 Million m³ gas, 120,000 barrels of condensate, and ½ Million tons of liquid gas per year.
  • Installations of this project consist of 3 well heads, 3 lines of 32-inch pipes, 3 lines of 4-inch off-shore pipe (105 km length), on-shore treatment plant, and 56 pipelines for gas transmission from Asaluye to Aghajari (512 km length).
  • The transmission from off-shore installations to the on-shore treatment plant takes 3 stages. On-shore installations also include gas condensate stabilizing and production of liquid gas (LPG).
  • In this project, TECL undertakes the power plant and transmission line, electrical and I&C works, and erection and commissioning of the above-mentioned phases.
  • TECL has undertaken the following services in this project: 4 x 480 MW and the temporary 132kV transmission line.

OIL & GAS

MANAGEMENT CONTRACTING OF CONSTRUCTION UTILITY PRODUCTION PLANT

Project Management of the Utility of refinery the purpose of this project:

  • Steam Production (High pressure, medium pressure and low pressure) for the refinery
  • Demin waster production, distilled water production, service and drinking water production for the refinery.
  • Production electricity energy for the refinery.
  • Sales of excess produced water and electricity.

168 MW SIMPLE CYCLE GAS TURBINE POWER PLANT

  • Management of all executive actions including erection pre-commissioning, commissioning of temporary power plant project through effective executive management. Performing tenders and contract negotiations with the contractors and executive teams.
  • Management and supervision of all erection, commissioning, and pre-commissioning processes and project confirmation from contractors and executive teams.

ERECTION OF ELECTRICAL AND I&C

  • Erection, pre-commissioning, and commissioning of different systems including mechanical, electrical, and I&C of the plant according to project policies.

COMMISSIONING

  • Providing system, commissioning schedule, setting list of allI&C and protection systems with the aid of a group of commissioning experts, as well as inspection and testing equipment, and eventually plant's pre-commissioning and commissioning, followed by the employer's confirmation.

OPERATION

  • Conducting all actions pertaining to expert employment for operations, performing all related operationalactivities in equipment, system units, and temporary substation until the temporary delivery certificate is issued.

GUARANTEE SERVICES

  • Providing qualified experts for supervision of client operations and removing defects during the guarantee period, along with completion-related documentation.

OIL & GAS

CLIENT:   Oman Oil Refineries and Petroleum Industries Company (ORPIC)

PROJECT:   ORPIC Utility Plant

  • 2x25 MW Gas Turbine Power Generators (Frame 5 - BHEL of India)
  • 2x100 TPH, Heat Recovery Steam Generator (HRSG-Sices of Italy)
  • 1x30 TPH, Auxiliary Boiler (Sices of Italy)
  • Desalination Plant MED-TVC (SWS/Sofinter of Italy)
  • Polishing Plant (Aquatec of India)
  • Fuel Gas Conditioning
  • DCS, FCS & SCADA Control System (Yokogawa of Japan)

PROJECT:   Gas Field 132/33kVPower Transmission Line

  • 100MVA Temporary Power transmission

Scope of project is consist of Design, Procurement, Construction, Commissioning and Start-up of 100 MVA, 132/33 kV Dual Redundant Temporary Power Transmission Line.

GAS TREATMENT REFINERY POWER PLANT

OPERATIONAL SUMMARY IN MECHANICAL SECTION

  • Construction of all piping lines between the turbines and lateral systems on the pipe rack
  • Erection and commissioning of 3 Siemens turbo generators typhoon single shaft generator with all the auxiliary equipments
  • Erection and commissioning of 2 compressor and condenser systems with the rated capacity of 50 tones
  • Piping of hydrant system with GRP pipes
  • Erection and commissioning of one diesel generator with all auxiliary equipments

OPERATIONAL SUMMARY IN ELECTRICAL SECTION

  • Construction and commissioning of LV/HV switch gear
  • Cabling and wiring
  • Erection and commissioning of transformators 11/0.42 KV and 1500 KVA
  • Erection of lighting system
  • Erection emergency systems (Diesel Generator, UPS)

OPERATIONAL SUMMARY IN 1&C SECTION

  • Testing and calibration of I&C equipments
  • Erection of I&C piping, hydrostatic test for pipes and I&Cjoints
  • Erection of junction box
  • Erection of all trays and ladders, cabling of junction boxand all the required termination and wiring of I&C equipment of control panel
  • D) Pre-commissioning of turbo generators based on Siemens instruction manual and representation supervision

TECL has vast experience in repair and refurbish of equipment of power plants. re-babbit of journal bearings, repair of fixed and rotary equipment is workshop by replace or repair the defected parts and also implement the required tests.

SUBSTATION COMMISSIONING

TECL is a well-known general contractor in the field of commissioning of the LV,MV and HV substations which includes all indoor and outdoor equipment as follows:

  • High voltage equipment including circuit breakers, disconnectors /earthing switches, current transformers, capacitive voltage transformers, line traps, etc.
  • Substation Control and monitoring System (SCS system).
  • LV power and control cables.
  • Grounding system.
  • Lightning protection system.
  • Complete P.L.C and telecommunication system and accessories.
  • Complete SCADA equipment, RTU and accessories
  • Protection, control and measuring systems, equipment.
  • Event and fault recording systems including in DCS system.
  • AC & DC auxiliary systems.
  • Emergency diesel generator.
  • Fire detection system for substation building.
  • Manual firefighting system for substation building.

REFERENCES

  • Najaf 132 kV Substation Commissioning
  • Capacitor Bank Commissioning.
  • 20kV/63kV Substation Commissioning
  • Transformers Commissioning
  • Switchgear Commissioning
  • Participate in Commissioning of HV Substations in Oman Protection Test and Setting in Many Substations
  • Rumaila gas power station 11 kV Switchgear: Incoming and outgoing Feeders Protection relay testing.
  • Rumaila gas power station 400 kV GIS: Test and service of circuit breaker including synchronization of poles,timing test,contact resistance and spring charge of motor.
  • Shuiba gas power station: design and adding a new feeder. South Baghdad II gas power station: Feeders testing.
  • Al Anmaa steel factory power plant: complete swithgears, substation and transformer test.
  • Etc.

STEAM TURBINE AND BOILER CAPABILITIES

STEAM TURBINE ROTORS AND STATORS PARTS

Experiences and Capability of Refurbish and Repair Various Models of Steam Turbine Rotors;

Residual Life Assessment and Analysis of Damaged Parts;

Nondestructive Tests (NDT) According to MT, PT, RT, UT methods, Eddy Current and Visual Inspection; Industrial Machining of Parts;

Heat Treatment and Industrial Welding: Low Speed Balancing and Vibration Analysis of Medium-weight Rotors and All Rotor parts;

High Speed Balancing in vacuum up to Ao tons; De-Blading and Re-Blading as per OEM's Guidelines;

Manufacturing and rebbabiting Journal, Thrust Pad and Tilted Pad bearings: Rotor Integration (RI);

Manufacturing Steam Turbines Blades;

Repair the Turbine Casings: Cast Iron Snitching and On-Site Machining;

Manufacturing Various Parts of Turbines like High Temperature Pins, Casing Bolts, Seals, Gland Seals, Gaskets, Cross fire Tubes, Expansion Joints, Lock plates, Filters, Valves and etc.

Manufacturing or repair of condenser system including tubes.

BOILERS & HEAT EXCHANGERS

  • Ability to provide tubes (Plain, Finned and Ribbed), pipes and all other raw materials from The best international suppliers and to manufacture steam and combine cycle power plant boiler elements.
  • Experiences & Capability of Manufacturing:
    • Low & High Temperature Header
    • Steam Drum and Internal Parts
    • Super heater & Re-heater & Economizer
    • Water Walls (including all fin tubes types)
    • Hot Steam and Cold Steam Pipes
  • Ability to dismantling the boiler elements (such as Super heater, Re-heater, Economizer, Water Walls and Headers) and installing new elements including required tests and boiler start-up.
  • Experiences & Capability of Supply or Repair of Boilers Lateral Equipment Including:
    • Gas Air Heater
    • Steam Air Heater
    • Gas Recirculation Fan
    • Forced Draft Fan
    • Stack
    • Fuel System Replacement
  • Experiences & Capability of Manufacturing and Repairother equipment including:
    • Pressure Vessels
    • Separators
    • Inter Coolers
    • Heat Exchangers
    • Tanks
    • Convertor
  • Repair activities:
    • Inspection
    • Baffle Repair
    • Disassembly
    • Casing Repair
    • Flanges Repair
    • Re-Tubing
    • Assembly

POWER TRANSFORMER TESTING, SERVICING & SUPPLY

Our company offers complete solutions for testing, maintenance, refurbishment, and supply of power transformers for industrial facilities and utility networks.

With a team of qualified engineers, modern test equipment, and strict quality control procedures, we ensure maximum reliability, extended lifetime, and optimal performance of transformers in every operating condition.

SCOPE OF SERVICES:

  • Comprehensive on-site and workshop testing of power transformers (up to 400 kV)
  • Diagnostic testing: Dissolved Gas Analysis (DGA), oil quality tests, insulation resistance, and tan & (delta) measurement
  • Preventive and corrective maintenance programs
  • Transformer oil filtration, dehydration, and full regeneration
  • Overhaul, repair, and complete rewinding of power transformers
  • Tap changer inspection, cleaning, calibration, and replacement
  • Replacement of bushings, gaskets, seals, and all auxiliary components
  • Commissioning, load testing, and performance verification after repair or installation
  • Retrofit and life-extension projects for existing transformer systems
  • Supply of new, refurbished, or customized power transformers
  • Technical consultation, condition monitoring, and assessment reports
awards

Mussayeb Repair the generator and LP turbine Unit1

Al Client: General company of the production of Electricity AL-Furat Middle region.

Contractor: Toloue energy and Contracting Limited Company.

Subject Of Contract: Repair the generator and LP turbine of the first unit of AL-Mussaib thermal Power Plant.

awards

Hilla Repair the Generator Unit 1 (F9)

Client: General company of the production of Electricity AL-Furat Middle region.

Contractor: Toloue energy and Contracting Limited Company.

Subject Of Contract: Repair the first unit generator of the Hilla/2  gas Power Plant, according to the technical and commercial offers.

awards

Karbala Repair the Generator Unit 2 (F9)

Client: General company of the production of Electricity AL-Furat Middle region.

Contractor: Toloue energy and Contracting Limited Company.

Subject Of Contract: Repair the second unit generator of the Karbala gas power plant, according to the technical and commercial offers.

awards

Al-Heidarieh Repair Turbine Unit 2 (F9)

Al Client: General company of the production of Electricity AL-Furat Middle region.

Contractor: Toloue energy and Contracting Limited Company.

Subject Of Contract: Major Inspection(MI) + Casing alignment works for the second unit in Al-Heidarieh gas Power Plant, according to the technical and commercial offers.

awards

Al-Heidarieh Repair Turbine Unit 2 (F9)

Client: General company of Electricity production / Middle Region.

Contractor: Toloue energy and Contracting Limited Company.

Subject Of Contract: Rehabilitation of 46 sets used materials (Capital parts) for the turbine of units (F6B, F-5) for Al-Taji/1 and Al-Taji/2 Power Station

awards

Supplying Spare Parts and Rehabilitation Works for Eight GE-F5 Gas Turbine Units

Supply spare parts and performing all rehabilitation, major overhaul and commissioning of 8 x GE-Frame 5 gas turbine units in South Baghdad power station including all units' auxiliaries and refurbishment of some Hot Gas Path components and reused again. The HFO base load energy on ISO conditions was successfully achieved.

South Baghdad II Gas Power Station – Baghdad, R.O. Iraq

awards

Rehabilitation and Renovation of 2xGE-F5 Gas Power Station and its Substation

Design and manufacturing of two Air Intake systems with pulse jet; design and supply equipment and installation of new 132kV feeder; complete rehabilitation with supplying of damaged parts; renovation of all electrical and Instruments and control systems for two GE-F5 gas turbine units in Shuiaba gas power station and related auxiliaries.

Shuiaba Gas Power Station – Basrah, R.O. Iraq
awards

Major Overhaul and Supply Damaged Parts of GE-F6 Gas Turbine Unit

Supply of all necessary parts, engineering work and performing major overhaul on turbo-compressor, generator, related auxiliaries and renovation of all electrical, instrument and control systems for GE-Frame 6 gas turbine unit in Nassiriyah gas power station. The base load energy on ISO conditions was successfully achieved.

Nassiriyah Gas Power Station – Thi Qar, R.O. Iraq

awards

Rehabilitation and Supply necessary Parts of GE-F6 Gas Turbine Units

Complete engineering work, supply of necessary parts, rehabilitation and operation of GE-Frame 6 gas turbine unit in Samawa gas power plant along with the renovation of all electrical and instrument systems according to technical specification and project policies. The base load energy on ISO conditions was successfully achieved.

Samawa Gas Power Station –Al-Muthanna, R.O.Iraq

awards

Supply of All Materials and Manufacturing of Boiler Coils and Panels

Preparation of drawings by survey and reverse-engineering at site and supplying all raw materials and manufacturing of Economizer Coils & Headers, furnace Baffle Wall tubes & panels and Rear Wall panels for the boilers (980 ton/hr) of 4 x 320 MW units in Al-Mussaib T.P.P and training for pipe welding and fitting.

Al-Mussaib Steam Power Plant – Babil, R.O. Iraq

awards

Major Overhaul of 320 MW Steam Turbine, Generator and Auxiliaries

Engineering work, supply of all necessary parts and materials and major overhaul of Al-Mussaib 320 MW unit including steam turbine (HP, IP and LP rotors), generator, auxiliaries, MESVs, Governors and ICV, oil systems, adjusting foundations and bearing levels and renovation of electrical and Instrument systems.

Al-Mussaib Steam Power Plant – Babil, R.O. Iraq

awards

Overall Fact Finding and Providing Solutions for a Thermal Power Plant

Technical report on the state of the 4 x 320 MW units of Al-Mussaib steam power plant and assessment of defects and problems along with providing solutions and maintenance strategies for all units including steam turbine, generator, auxiliaries, thermal cycle, boiler, electrical system, control system and etc.

Al-Mussaib Steam Power Plant – Babil, R.O. Iraq

awards

Engineering, Supply Materials and Rehabilitation of 132kV Switchyard

Rehabilitation and supply of HV, protection and control equipment of 132 kV Switchyard consisting of thirteen 132kV feeders and renovation of HV equipment along with construction of new foundations and structures. Supplying a new control room with all panels, LVAC and LVDC systems and implementation of the digital control system.
Najaf 132 kV Switchyard – Najaf, R.O. Iraq
awards

Major Overhaul and Rehabilitation of Two GE-Frame 9 Gas Turbine Units

Disassembly, major overhaul and replacement of Hot Gas Path components with refurbished components for two GE-frame 9 gas turbine units including compressor, turbine and generator. Renovation of all electrical and control systems detecting, removing oil leakages and performing oil test for 160 MVA main Transformer.

Khor Al-Zubair Gas Power Station – Basrah, R.O. Iraq

awards

Refurbishment and Supply Spare parts for Two GE-Frame 9 Gas Turbine

Supply of all consumable materials for HGPI, refurbishment and repairing parts for two GE-F9 turbines including first and second stages buckets, first and second stages nozzles, Transition pieces, Cross fire tubes, Cap & Liners, Bull Horns and Dual fuel Nozzles according to technical standards and project policies.

Khor Al-Zubair Gas Power Station – Basrah, R.O. Iraq

awards

Refurbishment of 2 Sets of Combustion Cap &Liners of GE- Frame 9

Supply of consumable materials and rejuvenation and refurbishment of Hot Gas Path components including two sets of combustion Cap and Liners of GE-Frame 9 in Al-Heidariyah gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Al-Heidariyah Gas Power Station – Najaf, R.O. Iraq

awards

Refurbishment of Two Sets Combustion Transition Piece of GE- Frame 9

Supply of consumable materials and rejuvenation and refurbishment of Hot Gas Path components including two sets of combustion transition pieces of GE-Frame 9 in Al-Khairat gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Al-Khairat Gas Power Station – Karbala, R.O. Iraq

awards

Refurbishment of 2 Sets of Combustion Cap &Liners of GE- Frame 9

Supply of all consumable materials and rejuvenation and refurbishment of Hot Gas Path components including two sets of combustion Cap and Liners of GE-Frame 9 in Hilla gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Al-Hilla Gas Power Station – Babil, R.O. Iraq

awards

Refurbishment of Two Sets Combustion Transition Piece of GE- Frame 9

Supply of consumable materials and rejuvenation and refurbishment of hot gas path components including of two sets of combustion transition pieces of GE-F9 in Al-Heidariyah gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Al-Heidariyah Gas Power Station – Najaf, R.O. Iraq

awards

Refurbishment of 2 Sets of Combustion Cap & Liners of GE- Frame 9

Supply of consumable materials and rejuvenation and refurbishment of Hot Gas Path components including of two sets of combustion Cap and Liners of GE-Frame 9 in Al-Khairat gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Al-Khairat Gas Power Station – Karbala, R.O. Iraq

awards

Refurbishment of 2 Sets of Combustion Cap & Liners of GE- Frame 9

Supply of all consumable materials and rejuvenation and refurbishment of Hot Gas Path components including two sets of combustion Cap and Liners of GE-Frame 9 in Karbala gas power station by repairing them according to the relevant standards and technical specifications and returned them to the client for future use.

Karbala Gas Power Station – Karbala, R.O. Iraq

awards

Supervisory Services of Minor Inspections for Two V94.2 Gas Units

Supervisory services for minor inspection of two V94.2 gas units in Al-Sadir gas power plant, including: Air intake, Lower parts, IGV inspection and check the position, Compressor blades - stage 1, Combustion chamber - left and right, Turbine Blades - stages 1 & 2 and Exhaust casing

Al-Sadir Gas Power Station - Baghadad, R.O.Iraq

awards

Rehabilitation of Oil Pump Journal Bearing for V94.2 Gas Turbine

Supply of consumable materials and rehabilitation of oil pump journal bearing for V94.2 gas turbine in Al-Sadir gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications and returned the parts to the power plant.

Al-Sadir Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of Six Sets of GE-F5 1st and 2nd Stage Nozzles

Supply of consumable materials and rehabilitation of Hot Gas Path components including GE-Nuovo Pignone, 1st and 2nd stage Nozzles Six complete sets for GE-frame 5 gas turbines in South Baghdad II gas power plant according to the relevant standards and technical specifications. 

South Baghdad II Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 11 Sets of Hot Gas Path Parts for H-25 Turbines

Supply of consumable materials and rehabilitation for Hot Gas Path components in workshop including 1st and 2nd stage Nozzles (X 2), Transition Pieces (X2), 1st and 2nd stage Shrouds (x2) and 1st stage Bucket for Hitachi H25 gas turbines in Al-Taji gas power plant according to the relevant standards and technical specifications.

Al-Taji Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of Cap & Liner, Transition Piece and Flow Sleeve for GE F-9

Supply of consumable materials and rehabilitation for three sets Hot Gas Path components in workshop including Cap & Liner, Transition Piece and Flow Sleeve for GE-Frame 9 gas turbine in Al-Quds gas power plant in a short time and according to the relevant standards and technical specifications and returned them to the client.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of Ten Sets of GE F-9 Hot Gas Path Components

Supply of consumable materials and rehabilitation for Hot Gas Path components in workshop including 1st, 2nd and 3rd stages Nozzles, 1st, 2nd and 3rd stages Buckets and Pin Dowels for Ge-Frame 9 gas turbines in South Baghdad I gas power plant according to the relevant standards and technical specifications.

South Baghdad I Gas Power Station, Baghdad R.O.Iraq

awards

Overhaul of LP Turbine Including Dismantling and Assembling

Dispatching required manpower for performing overhaul including disassembly and assembly of the LP turbine in unit no.2 of 4x320 MW Al-Mussaib Steam power plant, considering dispatching turbine specialist and performing according to the relevant standards and technical specifications

Al-Mussaib Steam Power Plant, Babil R.O.Iraq

awards

Overhaul of Turbine Oil Pumps, Repair of Bearings and Alignment

Dispatching required manpower for performing overhaul of turbine oil pumps, repair of bearings and alignment it in unit no.2 of 4x320 MW Al-Mussaib steam power plant, considering dispatching specialist 8000 hours guarantee period of the job Performing the work in a short time

Al-Mussaib Steam Power Plant - Babil, R.O.Iraq

awards

Overhaul of HP and IP Turbine Main Steam Valves and Governors

Dispatching required manpower for performing overhaul including disassembly and assembly of the HP and IP turbine Main Steam Valves and Governors in unit no.2 of 4x320 MW Al-Mussaib steam power plant, considering dispatching specialist and performing according to the relevant standards and technical specifications

Al-Mussaib Steam Power Plant - Babil R.O.Iraq

awards

Refurbishment and Test of the Pump of Fire Resistance Fluid (FRF)

Delivery of parts from power plant and performing rehabilitation and test of Fire Resistance Fluid (FRF) pump in workshop and delivery it to the site for 4x320 MW Al-Mussaib steam power plant, considering performing according to the relevant standards and technical specifications 8000 hours guarantee period of the job

Al-Mussaib Steam Power Plant - Babil, R.O.Iraq

awards

Refurbishment of Six Sets of V94.2 Rotor and Stator Blades

Supply of consumable materials and rehabilitation of six sets of rotor and stator blades of V94.2 gas turbines in Al-Sadir gas power plant according to the relevant standards and technical specifications and returned the parts to the power plant, considering 8000 hours guarantee period of the job Performing the work in a short time

Al-Sadir Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of Eight Sets of GT13D C Turbine Parts

Supply of consumable materials and rehabilitation for hot gas path components in workshop including: Inner Liners (X 3), Hot Gas Casing (X 3), Flow Sleeve (X 3) and Carrier (X 2) for  GT13D C gas turbines in Najaf gas power plant according to the relevant standards and technical specifications and returned the parts to the power plant.

Najaf Gas Power Station - Najaf, R.O.Iraq

awards

Refurbishment of Ten Sets of GT 13 D Blades, Vanes & HGP Parts

Supply of consumable materials and rejuvenation and refurbishment for 1st, 2nd & 3rd stages Blades and Vanes, Inner Liner, Hot Gas Casing and Heat Shield Segments for BBC GT 13 D gas units for Al-Najaf gas power plant in a short time and according to the relevant standards and technical specifications and returned them to the client.

Najaf Gas Power Station - Najaf, R.O.Iraq

awards

Refurbishment of 21 Sets of H25 Hitachi Blades & Vanes

Supply of consumable materials and refurbishment of blades & Vanes & HGP components including: 1st Stage Vane (X2), 2nd Stage Vane (X4),1st Stage Blade (X3), 2nd Stage Blade (X2), 3rd Stage Vane (X2), 1st and 2nd stage Shrouds (X2), Liners (X1), Transition Pieces (X3) for Hitachi H25 gas turbines in Al-Taji gas power plant.

Al-Taji Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 17 Sets of Buckets & Nozzles for GE-F5 Gas Units

Supply of consumable materialsand refurbishment for hot gas path components in workshop including:
1st Stage Nozzle (X9), 2nd Stage Nozzle (X8), for GE-Frame 5 gas turbines in South Baghdad II gas power plant according to the relevant standards and technical specifications and returned them to the client.

South Baghdad II Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 2 Sets of Generator Bearings for GE-F9 Gas Units

Delivery of parts from power plant and performing refurbishment and test of Generator journal bearings in workshop and delivery it to the site for GE-Frame 9 South Baghdad I gas power station, considering 8000 hours guarantee period of the job; Performing the work in a short time.

South Baghdad I Gas Power Station, Baghdad, R.O.Iraq

awards

Refurbishment of 14 Sets Nozzles, Buckets and HGP parts for GE-F9

Supply of consumable materials and rehabilitation for three sets Hot Gas Path components in workshop including Cap & Liner (X2), Transition Pieces (X2) and Flow Sleeve (X2), 8 sets of 1st & 2nd & 3rd stages Nozzles and Buckets for GE-Frame 9 gas turbine in Al-Quds gas power plant in a short time and according to the relevant standards and technical specifications.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 9 Sets of Blades & Vanes for GE-F9 Gas Units

Supply of consumable materials and rehabilitation for Hot Gas Path components in workshop including:

1st Stage Nozzle (X2), 2nd Stage Nozzle (X2), 3rd Stage Nozzle (X2), 1st Stage Bucket (X2) and 2nd Stage Bucket (X1) for GE-Frame 9 gas turbines in South Baghdad I gas power plant according to the relevant standards.

South Baghdad I Gas Power Station - Baghdad, R.O.Iraq

awards

Repair of Unit A, GCB Hydraulic System for GE Frame 9 Gas Units

Disassembling, Supply of necessary spare parts, Repair of hydraulic system, Assembling, Filling and flashing, Test and delivery.
for GE-Frame 9 gas turbines in South Baghdad I gas power plant according to the relevant standards and technical specifications.

 8000 hours guarantee period of the job.


South Baghdad I Gas Power Station - Baghadad, R.O.Iraq

awards

Repair of Generator Stator & Rotor for GE Frame 9 Gas Units

Supply of consumable materials and disassembling, performing electrical tests, machining and assembling of stator and supply of consumable materials, disassembling, replace insulations, changing the rotor blocks and spacers and assembling of rotor for GE-Frame 9 gas turbine Genarator in Al-Quds gas power plant in a short time.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of Two Torque Converters for GE-F 9 Gas Turbines

Supply of consumable materials and rehabilitation of two Torque Converters for GE-Frame 9 gas turbine in Al-Quds gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications and returned the parts to the power plant.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of 7 Oil Pumps for GE Frame 9 Gas Units

Supply of consumable materials and rehabilitation of seven Oil Pumps for GE-Frame 9 gas turbine in Al-Quds gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications and returned them.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Overhaul & Repair of Hitachi H-25 Gas Units Parts and Equipment

Supply of consumables and repair of the following parts and equipment:
- Accessory Gear Box
- Reducers and Beraings of Hydraulic Torque Converter
- Diesel Engine Internal Parts
- Generator Rotor
for Hitachi H-25 gas units in Al-Taji gas power staion.

Al-Taji Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of Two Starting Motors for GE-Frame 9 Gas Units

Supply of consumable materials, rejuvenation and rehabilitation of two starting motors for GE-Frame 9 gas turbine in Al-Quds gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 3 Sets of GE-Frame 9 Buckets & Nozzles

Supply of consumable materials, rejuvenation and rehabilitation for three sets Buckets & Nozzles of GE-Frame 9 gas turbine in Al-Quds gas power plant. Including delivery of parts from the warehouse, repair in a short time and according to the relevant technical specifications and returned the parts to the power plant.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of One 5 MVA Transformer for Najaf New Power Plant

Rehabilitation of one 5 MVA Transformer for Najaf new gas power plant, considering:

  Supply of consumable materials and repair the Transformer according to the relevant technical specifications and  standards.

8000 hours guarantee Performing the work in a short time

Najaf Gas Power Station - Najaf, R.O.Iraq

awards

Rehabilitation of Six Fuel Oil Pumps Bearings for GE-Frame 9 Units

Supply of consumable materials and rehabilitation of six Fuel Oil Pumps Bearings for GE-Frame 9 gas turbine in South Baghdad I gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications.

South Baghdad I Gas Power Station - Baghdad, R.O.Iraq

awards

Supply of Material and Parts for GE Frame 6 Gas Unit

Supply of the following materials and parts:
  Gas Fuel Stop Valve (2 Sets) including Motor Controller
   IGV Servo Valve (2 Sets)
   Turbine Velocity Transducer (6 Sets)
for GE-Frame 6 gas turbines in Nassiriyah gas power station.

Nassiriyah Gas Power Station - Thi Qar, R.O.Iraq

awards

Refurbishment of Blades, Liner and Shrouds for GE-Frame 6 Gas Unit

Supply of consumable materials and rejuvenation and rehabilitation for 1st and 2nd stage blades, Liner and 1st, 2nd & 3rd stage shrouds for GE-Frame 6 gas turbine in Nassiriyah gas power plant in a short time and according to the relevant standards and technical specifications and returned them to the client

Nassiriyah Gas Power Station - Thi Qar, R.O.Iraq

awards

Refurbishment of Two Turbine and Generator Journal Bearings

Delivery of parts from power plant and performing rehabilitation and test of two Turbine and Generator Journal Bearings in workshop and delivery it to the site  for GE-Frame 9 gas turbine in Al-Quds gas power station according to the relevant standards and technical specifications and 8000 hours guarantee period of the job.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of Four Generators for GE-Frame 9 Gas Units

Supply of consumable materials, rehabilitation of four Generator for GE-F9 gas units in Al-Quds gas power station. Including dismantling, cleaning of Stator and Rotor, performing insulation of phases at the end side, repair of the defective Bars, repair or changing of Bar insulators, welding of Stator bars, painting of Stator & Rotor insulation,  executing all necessary electrical tests and assembly.

Al-Quds Gas Power Station - baghdad, R.O.Iraq

awards

Rehabilitation and Improvement of Three Jacking Oil System

Supply of Jacking Oil pumps and motors, cables, tubes, consumables and rehabilitation and modification Jacking Oil system for three GE-F9 units in Al-Quds gas power plant, including supply and install of 2 pumps & motors for each unit, overhaul and inspection entire of Jacking Oil skids, new design and relocating of the pipes and commissioning.

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 27 Sets of GE-F9 Buckets, Nozzles & HGP Parts

Supply of consumables and rehabilitation of Hot Gas Path components in workshop including:1st Stage Nozzle (X3), 2nd Stage Nozzle (X3), 3rd Stage Nozzle (X3), 1st Stage Bucket (X3), 2nd Stage Bucket (X3), 3rd Stage Bucket (X3), Flow Sleeve (X3), Transition Piece (X3), Cap & Liner (X3) for GE-Frame 9 gas turbines in Al-Quds gas power plant according to the relevant technical specifications. 

Al-Quds Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 7 sets of Generator Bearings for GE-V94.2 Gas Units

Delivery of parts from power plant and performing refurbishment and test of Turbine and Generator journal bearings in workshop and delivery it to the site for V94.2 Al-Sadr gas power station, considering performing according to the relevant standards and technical specifications  and 8000 hours guarantee period of the job

 Performing the work in a short time

Al-Sadr Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 13 Sets of V94.2 Blades, Vanes and HGP Parts

Supply of consumables and rehabilitation of 1st Stage Blades (X2), 2nd Stage Blades (X2), 3rd Stage Blades (X2),4th Stage Blades (X1) 1st Stage Vanes (X2), 2nd Stage Vanes (X2), Inner Casing (X1), Mixing Chamber (X1) and upper and lower parts for turbine bearing for V94.2 gas units in Al-Sadr gas power plant according to the relevant technical specifications.

Al-Sadir Gas Power Station - Baghdad, R.O.Iraq

awards

Rehabilitation of One Generator for GE-Frame 9 Gas Units

Supply of consumables, rehabilitation of one Generator Stator and Rotor of GE-F9 gas turbine in Al-Kahla gas power plant. Including dismantling, cleaning, insulating of phases at the end side, repair of the defective bars, repair or changing of bar insulators, welding of bars, painting insulation, executing all necessary electrical tests and assembly.

Al-Kahla Gas Power Station - Basrah, R.O.Iraq

awards

Rehabilitation of Three Generators for GE-Frame 9 Gas Units

Rehabilitation of one Generator Stator and Rotor including dismantling, cleaning, repair of the defective bars, welding of  bars, painting of insulation, executing all necessary electrical tests and assembly. And  repair the cracks in Inner Frame and modify the machine body to change the natural frequency and vibration analysis for GE-F9 Generator in Al-Khairat gas power plant. 

Al-Khairat Gas Power Station - Baghdad, R.O.Iraq

awards

Replace HV Cables Between Generator and Transformer

Replacement of HV cables between Generator and Step-Up Transformer for four units in South Baghdad II gas power plant including test and cleaning of stored cables, repair of stored cables, roll up the old cables, cleaning of trenches and cabling and termination and final test.

South Baghdad II Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 6 Sets of Buckets and Nozzles of GE-F5 Gas Units

Supply of consumable materials and rehabilitation of Buckets and Nozzles in workshop including:
1st Stage Nozzle (X2), 1st Stage Bucket (X2) and 2nd Stage Bucket (X2) for GE-Frame 5 gas turbines in South Baghdad II gas power plant considering performing according to the relevant standards and technical specifications

South Baghdad II Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 22 Sets of Blades, Vanes & HGP Parts of 13D Turbines

Supply of consumable materials and rehabilitation of Blades and Vanes in workshop including:

1st, 2nd and 3rd Stages Blades and Vanes, A-B Shield Heat Segments, Dual Fuel Lances, Liner, Front Segments, Burner, cylindrical sleeve and Journal and Thrust bearings for BBC 13D gas turbines in Najaf gas power plant.

Najaf Gas Power Station - Najaf, R.O.Iraq

awards

Rehabilitation of Six Main Gearbox Bearings for GE-Frame 9 Gas Units

Supply of consumable materials, rejuvenation and rehabilitation of six Main Gearbox Bearings for GE-Frame 9 gas turbine in South Baghdad I gas power plant. Including delivery of parts from the warehouse of the power plant, repair in a short time and according to the relevant standards and technical specifications and returned the parts to the power plant.

South Baghdad I Gas Power Station - Baghdad, R.O.Iraq

awards

Refurbishment of 6 Sets of Buckets, Nozzles and HGP Parts of GE-F9 Gas Units

Supply of consumable materials and rehabilitation of six sets of Buckets and Nozzles and Cap & Liner  for GE-Frame 9 gas turbines in South Baghdad I gas power plant considering:
- Performing according to the relevant standards and technical specifications
-  8000 hours guarantee period of the job
-  Performing the work in a short time

South Baghdad I Gas Power Station - Baghdad, R.O.Iraq

awards

Muscat International Airport Mechanical,Electrical and Piping

PVC Concealed conduting in slab/wall, vertical wall chasing, wire pulling, and other ELV systems. Installation of cable tray, trunking, accessories and supports. Installation of DBS, sub main zanels, LT panels, HT panels and transformers. Installation of light fixtures and any other electrical equipment.

Muscat Airport - Sultanate of Oman

awards

Engineering and Managment of Refinery Gas Turbines,HRSG and Desalination

Engineering and managment of co-generation project in Muscat refinery with ORPC company including Engineering, Supply, Construction and Commissioning of two GE-F5 turbine generators and two sets of HRSG and desalination units and other mechanical and electrical and control facilities for ORPC company.

Muscat Refinery - Sultanate of Oman