Power Plant Name And Description of Project
Complete rehabilitation of Turbine, Generator, Transformer, Control System and auxiliaries. 4 x GE frame 6
Design, supply and install new Up Stream (fog type) cooling system for Air Intake 2 x GE Frame 9 Units
Design, supply and install new Up Stream (media type) cooling system for Air Intake 2 x Siemens SGT 800 Units
Inspection Services Generator Rehabilitation.
Design, supply and install Up Stream cooling system for Air Intake by using existing downstream system 2 x GE Frame 9 Units
Refurbishment hot gas path parts 17 Set Fuel Nozzle for H25 GE F5 and F6 units
Major Inspection Services 4 Generators
Replace / repair generator stator bars 320 MW steam unit
Generator and LP turbine rehabilitation including re-insulation rotor and stator bars + supply and replacement Core End Plates + supply and replace generator stator coolant manifolds